The Forward Luohe Bridge Reconstruction and Expansion Project starts from Lihe Avenue in the north and ends at Hongqi Road in the south, with a total length of about 2 kilometers. Among them, the Luohe section of the viaduct was designed all for the steel box girder, the length of about 484 meters, a total of 163 sections need to be installed steel box girder, steel box girder sections weighing an average of 77.75 tonnes. To solve the current serious traffic congestion problems at the intersection of Binhe River South and Binhe River North Road, Processing production about: 5769.83t
Zhengdong New Area Baisha Cluster Science Valley Qiancheng Road across the bridge project's total length (including the bridge) is 383.031m, the total length of the bridge is 90m, and the standard width of the road is 67m.Processing and production of about: 1184.2t
The only cable-stayed suspension bridge over the Fuxin River in Fengxian County, after the completion of the bridge, will not only meet the needs of upgrading the navigation channel of the Fuxin River but also open up the northern part of Fengxian County to the fast channel of Shandong. Processing: 629t
Jian'an Interchange Project of Xuchang-Xinyang Expressway is an important part of Xuchang-Xinyang Expressway Project. To further optimize the structure of local road network, play the role of highway on the regional economy, town development, and facilitate the travel of people along the route. Processing production about: 1201.8t
Fengfei Road (North Ring Road - Longquan Road) road project is located in the central part of the sea camp area, for the north-south direction of a secondary urban road, the planning of the road red line width of 30 meters, from the North Ring Road in the south to the north of Longquan Road, a total length of 3,162 meters; processing and production of about: 4,696.6t
Torch Avenue is located in the high-tech zone of Luoyang City, an important freight transport corridor connecting FTZ, ZIPZ, Fengli Area and the western part of Luoyang City as determined by the planning of FTZ. Processing production about: 40t
This project has been effective in improving traffic congestion and transport efficiency for the benefit of traders, manufacturers and residents along the route and is one of the infrastructure projects prioritized by the EAC to promote regional integration. Gross processing weight: 1099.5t
The project has been effective in improving traffic congestion and transport efficiency for the benefit of traders, manufacturers and residents along the route, and is one of the EAC's priority infrastructure projects for regional integration.
This project effectively improves traffic flow and eases urban traffic pressure. It significantly eases traffic bottlenecks and improves road capacity.
Rufang section of Jiaotang Expressway SG-1 standard project manager department of the third branch of the construction mileage of K32 + 000 ~ K48 + 200, a total length of 16.2km, the new interchanges in 2 places (Shandong East Interchange, Zhangliang Interchange). Processing production about: 1017.2t
Total weight of highway steel bridge fabrication for 60km OPRC road project in Mozambique: 307.98t
The project has been effective in improving traffic congestion and transport efficiency for the benefit of traders, manufacturers and residents along the route, and is one of the infrastructure projects prioritized by the EAC to promote regional integration.
The railway steel bridge, as part of the railway line, ensures continuity and accessibility of railway traffic. It connects the two ends of the railway and allows trains to pass through smoothly, regardless of the terrain.