Canal bridge project works, from the station on the north of the South Road and fishery Huang Road intersection to the south 100 meters, south to the Beijing-Hangzhou Road, a total length of about 810 meters. The total length of the bridge is about 417 meters, and the width of the road red line is 45 meters, which is designed according to the design of an urban trunk road with six lanes in both directions. Processing production: 945t
Binhe South Road West renovation and upgrading project, east of the Gucheng Expressway Xiyuan Bridge west of the road gradient section, west to Wenzhong Avenue, a total length of 6.1 kilometers, in accordance with the red line width of 40 meters for the renovation and upgrading of the existing road on the north side of the new east-to-west lanes, will be the existing bidirectional 4-lane upgraded to the standard of bidirectional 6-lane. Processing production about: 280t
This project effectively improves traffic flow and eases urban traffic pressure. It significantly eases traffic bottlenecks and improves road capacity.
Kaiyuan Avenue over Xinyi Street is an important part of the Xinyi Street South Extension Project.
This project is along the yellow highway from Wuzhi to Jiyuan section YHSG-2 bidding section, all located in Henan Province Wuzhi County within the scope of the starting pile number for K24 + 700, the end of the pile number for the K50 + 002.994, the total length of 25.303km, for two-way six-lane highway, using 120 km / h design speed, roadbed width of 34.5 meters. Processing production about: 6594.
Qinyang-Yichuan Expressway is the key construction project of Henan Provincial Expressway ‘13445 Project’, in which the main bridge of Yellow River Bridge has 54 piers, with a total length of 2,585 meters, which is the controlling project for the whole line, adopting the technical standard of bi-directional six-lane motorway, with the design speed of 120 km/h. Processing production about: 7958t
Luoyang City, one of the first projects to benefit the people, the city Le Road is like a beautiful tie, in the park, the water system, roadside extension, linked up the good mountains and water in Luoyang, good scenery, extending into the happy life of the people, a ‘Le Road’ built and put into use, not only to enhance the city's taste, but also to become convenient for the people to benefit the people of the cityscape! The construction and commissioning of a ‘music road’ not only enhances the city's taste but also becomes a convenient and beneficial urban landscape! Processing production about: 360t
Interchange is divided into A, B, C, and D four ramps. The bridge has a total length of 1979.49 meters, the lower part of the bridge adopts a pile foundation, the pile diameter is 1.2, 1.5, 1.8 meters, the pile length is 12 meters, a total of 211 piles; the bridge pier adopts column pier, the pile columns are connected by the tie beams, the total number of piers is 192; the processing and production of about: 1030t
This project is of great significance in promoting Hakka root worship and cultural exchanges and upgrading the city's cultural image. After the completion of the project, it will become a landmark of the Yellow River cultural roots and the spiritual home of the Hakka people in the world and will play a positive role in promoting the construction of Luoyang as an international center of humanistic communication. Processing production about: 114.6t
The main bridge superstructure using a continuous steel box girder, beam height of 1m, the full width of 5.3 The main bridge superstructure adopts continuous steel box girder with a beam height of 1m, full width of 5.3m, net width of 4m, and 0.5m wide green belt on both sides. The urban slow road network structure will be perfect, and further enhance the general public's sense of well-being, sense of achievement.
Effectively alleviating the problem of difficult pedestrian crossing, while reducing the motor vehicle and pedestrian plane crossing, can also effectively improve the efficiency of motor vehicle traffic. Processing production about: 591.89t
The Hope Road Interchange on Yishui East Road starts from the west side of the Zhonghe Ocean Park project in the north and ends at Yishui East Road in the south, with 2 main lines and 8 ramps, which is a cloverleaf-type fully interoperable interchange. The total length of the interchange is 1.4 kilometers, the width of the red line is 25 meters, and the grade of the road is a secondary urban road. Processing production about: 1500t
The length of the steel bridge is 79.8 meters, the width is 7.7 meters, all the plates of the steel bridge are made of S355J2G3, and the weight is 179.112t.
In order to provide you with an accurate quote, please send us detailed information of your building,such as size,material,drawings etc.We respond quickly to any questions, inquiries, needs and feedback. Please feel free to contact us.